Woods Wiring LLC

The reference build

A 1990 camper that has crossed the country twice

Everything we sell was worked out on this unit first — a 20-foot, single-axle 1990 Kit Monterey, stripped and rebuilt around a Victron lithium system. It is not a showpiece. It is the truck that proved the specification.

The 1990 Kit Monterey prototype from the rear three-quarter, rooftop solar array mounted, parked on grass.
The prototype, rear three-quarter, August 2026. Work is in progress. Photography is being shot system by system as the current work closes up.

Power and storage

The bank, the inverter, the solar controllers and the monitoring were specified as one system rather than bolted on a piece at a time. That is the single biggest difference between this and a factory coach: nothing here was sized to hit a sticker price.

Storage
LiFePO₄ house bank with integrated BMS
Inversion
Victron inverter/charger
Charging
Shore, solar and DC-DC from the tow vehicle alternator
Monitoring
Victron Cerbo GX with VRM remote monitoring
Architecture
12 V — see the honest note below
Photo pending Distribution panel, door open, every circuit labelled

Solar

Enough to run the working day without starting anything. The array layout matters as much as the wattage — panels shaded by an air conditioner or a satellite dish are panels you paid for and do not have.

Array
1.1 kW rooftop
Controllers
Victron MPPT
Penetrations
Sealed and inspected at every roof entry
Rooftop solar array and a Starlink terminal on the 1990 Kit Monterey prototype.
Rooftop array and Starlink terminal on the prototype, August 2026.

Connectivity

Two years of working out of this thing established the actual requirement: the connection has to come up when the unit does, without someone climbing on the roof.

Satellite
Starlink, mounted and powered from the DC system
Network
Local router, wired to the system rather than a wall wart
Photo pending Satellite terminal mounted, and the interior router location

Site capability

Levelling, shade and light are what turn a parked trailer into somewhere you can actually work. The lighting is zone-switched so you can light the work area without lighting the bedroom window.

Levelling
Four-point electric
Awning
Electric
Lighting
Zone-switched exterior LED work lighting
Photo pending Unit set up on site, awning out, work lighting on, dusk

Tank heating system

This system is being fitted now, and the photography is being taken as it goes, because once the belly armour closes none of it can be photographed again without taking it apart.

Status
In progress
Heating
Thermostatic pads bonded to the tank shells
Lines
Heat tape under the insulation, not over it
Underbelly
Rigid foam, then riveted aluminium armour with weep points
Photo pending Tank heating pads and insulation, photographed before the belly closes

Inside

The inside of the 20-foot build

Dinette, galley, sleeping area and bath in a single-axle 1990 trailer. This is the unit as it is, in the light it has — nothing staged.

The dinette of the 1990 Kit Monterey prototype: a table with red bench seats under a patterned window.
The dinette.
Looking down the interior of the prototype trailer toward the dinette, with the galley sink on the right.
Looking toward the dinette, galley on the right.
The galley of the prototype trailer with a range and oven, a sink and drawers.
The galley.
The sleeping area of the prototype trailer with a wall-mounted TV.
The sleeping area.
The wall controller for the instant hot water heater, showing a temperature setting.
The controller for the instant hot water heater. The heater runs on propane and lights with 12 V.
The bath of the prototype trailer with a shower pan and toilet.
The bath.

What we would do differently — and tell you to do

Naming the weaknesses first is cheaper than being caught on them, so here is the honest list on our own build.

On the prototypeWhat we specify now
12 V architecture 48 V on anything built to order. A 3 kW inverter at 12 V pulls roughly 250 A continuously, which means parallel 4/0 cable and 400 A Class T protection. The same load at 48 V is about 63 A on 2 AWG. The cable alone pays for the change.
Improvised wiring in places Every circuit labelled at both ends, a printed panel legend, and an as-built schedule handed over with the unit. The prototype is being brought up to that standard now, which is exactly the work we sell.
Built to a budget, in a hurry Built like a house with an axle under it. RV manufacturers build to a weight and price target, and that is why their systems fail first at the tanks and the panel.